<!-- Canonical: https://x25courier.com/en/factory-gate-delivery/ -->
<!-- Language: en -->

# Arrange delivery to a factory gate

Industrial sites often have several gates. The wrong gate can delay handover.

## What to prepare

Business deliveries often depend on gates, access and time windows. Record where the goods can actually be handed over.

State the gate, ID rules and booking reference. Check whether the driver needs advance registration.

## Practical example

A factory needs spare parts. It specifies gate three and a goods-in contact.

## Important limits

Heavy loads need loading arrangements agreed in advance. A requested arrival time is not a confirmed commitment.

Choose the correct country booking portal. Pickup and delivery must be within the same country. Enter addresses, package dimensions, weight and desired time. Availability and prices can only be checked there. A trip is confirmed only after the booking is accepted.

- Switzerland: https://x25pronto.ch/en/
- Germany: https://x25pronto.de/en/
- Austria: https://x25pronto.at/en/
- More topics: https://x25courier.com/en/use-cases/
